Minutes of the special
meeting of the Georgetown Township Board, Planning Commission, and ZBA held
Tuesday, August 1, 2006 for the purpose of a Context Sensitive Solution
Workshop for the I-196 at Chicago Drive/Baldwin Street interchange construction
project
Meeting called to order by
Art Green, MDOT, at 6:00 p.m.
Present from the Township
Board: Bill Holland, Del South, Dale Mohr, R. J. Poel
Present from the Planning
Commission: Greg Honderd, Ron DeGood, Del South, Cornelius Huizinga,
Michael
Pearson, Ed Stasiak
Present from the Zoning Board
of Appeals: Carl DeVree
Present: Representatives from
the Michigan Department of Transportation, Ottawa County Road
Commission,
Georgetown Township, and Benesch
Present: Approximately 70
members of the public
The following
took place:
The following is a summary of
the round table discussion/information gathered:
1. Maintaining Traffic and Access During
Construction
·
Access throughout
the construction to residences and business
·
Temporary access
east end of Baldwin
·
Access to
Grandville bike path
·
Focus on Main to
Cottonwood
·
Eliminate left
turns
·
Phase A most
important to finish and open (expedite)
·
Keep east RR open
off Baldwin
·
Temporary cross
lot drive east end to service businesses at railroad tracks
·
When signal added
at Main
·
Continuous access
·
Main/Cottonwood
first
·
School buses turn
around-lane in and lane out
·
Big trucks for
deliveries need access between Main and wherever construction is
·
Impact on
school-get done during summer
2. Overall Aesthetics/Visual Appearance of Walls and Bridges:
·
Fancy bridge with
metal railing
·
Staggered brick
for retaining walls
·
Some color
good-white is bright
·
M-6 and S-curve
color good
·
Red brick color
scheme looks rich
·
Decorative lamp
posts
·
2008 work add
under-bridge lighting for trail
·
Consensus
treatment similar to M-6 or S-curve
·
Utilities
underground
·
Grass between
sidewalk and road
·
Walk-ability of
corridor-old mill-school kids look at history
·
Colors-local high
schools
3. Non-Motorized Pedestrian Facilities/Streetscape Facilities:
·
Lighting up to
trail, on street, tie all in
·
Trail use
weekends and nights
·
Unique to GT when
coming off ramp-sign let people coming into a residential/business area-slow
down
·
Pedestrian access
from Cottonwood to Main St., put in sidewalk
·
Safe
Baldwin/Cottonwood
·
Count-downs for
pedestrians
·
Access points
·
Coordination with
T for bike paths
·
Wide sidewalk on
north side of Baldwin
·
Support access
under Buck Creek to provide access to Grandville
·
Support
streetscape along Baldwin
·
Driveway to
Waster Water Treatment
·
Pocket park
·
Gateway to GT
·
Materials for
walkways
Noise concern-earth berm,
trees and shrubs by apartment complex
Cars going fast off ramp and
not slowing down-use signage
Entire interchange-Chicago
Dr.-tie all in together and see same type of thing
Boulevard?
Concern cast iron water-main
Main St.
four lanes? Left turn lane?
Signal phasing
The meeting was adjourned at
8:00 p.m.