  1. The 2006 Valve Exercise Program has been completed.  Due to the work load of our inspectors, it is planned to begin the 2007 Exercise Program yet in 2006.

 

  1. The GT9 Meter Station is operating with a few minor exceptions.  These are being address through the engineer and contractor.

 

  1. The Water GIS map has been sent back to the engineer for final drafting.

 

  1. Due to the rains our water consumption has gone down significantly.

 

    • 90 new homes under construction

 

    • 15 new meters installed

 

    • 8 new sewer connections

 

    • 74 final readings of water meters for home sales

 

 